Progress PDG9140E Manuale Utente Pagina 42

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 76
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 41
42
EN
progress
INSTALLATION
Wall drilling and bracket xing
As a rst step, proceed with the following drawings:
Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the centre of
the area in which the hood will be installed.
Draw a horizontal line at 650 mm above the hob.
• Place bracket 7.2.1 on the wall as shown about 1-2 mm from the ceiling or upper limit aligning the
centre (notch) with the vertical reference line.• Mark the wall at the centres of the holes in the bra-
cket.
Place bracket 7.2.1 on the wall as shown at X mm below the rst bracket (X = height of the upper
chimney section supplied), aligning the centre (notch) with the vertical line.
Mark the wall at the centres of the holes in the bracket.
Mark a reference point as indicated at 116 mm from the vertical reference line and 306 mm above
the horizontal reference line.
Repeat this operation on the other side.
Drill ø 8 mm holes at all the centre points marked.
Insert the wall plugs 11 in the holes.
Fix the lower bracket 7.2.1 using the 12a screws (4,2 x 44,4) supplied.
Fix the upper bracket 7.2.1 and the air outlet connection support 7.3 together using the 2 screws
12a (4,2 x 44,4) supplied.
Insert the two screws 12a (4,2 x 44,4) supplied in the hood body xing holes, leaving a gap of 5-6
mm between the wall and the head of the screw.
11
12a
306
X
116
1÷2
116
650 min.
7.2.1
Vedere la pagina 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 75 76

Commenti su questo manuale

Nessun commento